
Raytheon: AN/TPY-2 radar support gets a two-year extension
The ceiling rises by $394M. Only $112.3M is obligated now.
Company
Mapped by Backlog Defense. Verify before relying on it. The awards below are those we linked to RTX, including subsidiaries named in the announcement.
4 awards recorded, 19 Oct 2026 to 30 Oct 2026.
Amounts are shown one award at a time and are never added up: ceilings, modifications and obligated funds are not comparable.
| List date | Company | Branch | Kind | Stated amount | Contract | Source |
|---|---|---|---|---|---|---|
| 30 Oct 2026 | Pratt & WhitneyRTXRTXMapped by Backlog Defense. Verify before relying on it. | Air Force | Award | $25,193,724Ceiling | FA8252-27-D-B001 | Official list for 30 Oct 2026 |
Source textPratt & Whitney, Hartford, Connecticut, has been awarded a $25,193,724 ceiling cost-plus-fixed-fee contract for the component improvement program for secondary power systems and small gas turbine engines. This contract provides for engineering services and research and development to improve the safety, reliability, and maintainability of parts used to start main engines. Work will be performed in West Palm Beach, Florida, and is expected to be completed by Oct. 27, 2036. This contract was a sole-source acquisition. No funds are being obligated at the time of award; fiscal 2026 research, development, test and evaluation funds will be incrementally obligated over the next 10 years. The Air Force Sustainment Center, Hill Air Force Base, Utah, is the contracting activity (FA8252-27-D-B001). (Awarded on Oct. 28, 2026).
| ||||||
| 29 Oct 2026 | RTX Corp.RTXRTXMapped by Backlog Defense. Verify before relying on it. | Navy | Modification | $32,181,162 | N0001926C0112 | Official list for 29 Oct 2026 |
Source textRTX Corp., Pratt & Whitney Military Engines, East Hartford, Connecticut, is awarded a $32,181,162 cost-plus-incentive-fee modification (P00009) to a previously awarded contract (N0001926C0112). This modification exercises an option to provide recurring sustainment support to include repair of repairables support for the F135 propulsion systems used in the F-35A conventional takeoff and landing and F-35C carrier variant aircraft in support of the F-35 Lightning II program in support of the Air Force, Navy, Marine Corps, F-35 cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (40%); Oklahoma City, Oklahoma (21%); Indianapolis, Indiana (12%); West Palm Beach, Florida (6%); Windsor Locks, Connecticut (6%); Brekstad, Norway (4%); Leeuwarden, Netherlands (3%); Iwakuni, Japan (3%); Williamtown, Australia (2%); Cameri, Italy (1%); Marham, United Kingdom (1%); and Fort Worth, Texas (1%), and is expected to be completed in November 2027. Fiscal 2027 operations and maintenance (Air Force) funds in the amount of $16,453,791; fiscal 2027 operations and maintenance (Navy) funds in the amount of $4,164,560; fiscal 2027 operations and maintenance (Marine Corps) funds in the amount of $1,612,425; F-35 cooperative program partner funds in the amount of $5,738,624; and FMS customer funds in the amount of $4,211,762 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. | ||||||
| 22 Oct 2026 | Raytheon Co.RTXRTXMapped by Backlog Defense. Verify before relying on it. | Air Force | Modification | $350,000,000Ceiling increase | FA8672-19-D-0001 | Official list for 22 Oct 2026 |
Source textRaytheon Co., Tucson, Arizona, has been awarded a $350,000,000 ceiling increase modification (P00014) to previously awarded contract (FA8672-19-D-0001) for Small Diameter Bomb II life cycle support (GBU-53/B). The modification brings the total cumulative face value of the contract to $950,000,000 from $600,000,000. Work will be performed in Tucson, Arizona, and is expected to be completed by Dec. 31, 2030. No funds are being obligated at the time of award. The Air Force Life Cycle Management Center, Eglin Air Force Base, Florida, is the contracting activity.
| ||||||
| 21 Oct 2026 | Raytheon Co.RTXRTXMapped by Backlog Defense. Verify before relying on it. | Missile Defense Agency | Modification | No stated valueCeiling increaseNo value | HQ0147-18-D-0001Read the brief | Official list for 21 Oct 2026 |
Source textRaytheon Co., Woburn, Massachusetts is being awarded a contract modification (P00038) under a previously awarded indefinite-delivery/indefinite-quantity contract HQ0147-18-D-0001. This modification provides for a non-competitive, two-year extension and increases the contract ceiling from $2,605,033,000 to $2,999,033,000. The current contract was the result of a sole-source acquisition. Under this contract extension, Raytheon will continue operations and sustainment support for the Army Navy/Transportable Radar Surveillance and Control Model 2 (AN/TPY-2) radar systems, utilizing a combination of cost-plus-incentive-fee, cost-plus-fixed-fee, and firm-fixed-price contract line items. Associated task order extensions reflecting the increase are also being awarded. The work will be performed in Woburn, Massachusetts, and at multiple radar sites inside and outside of the continental U.S. The contract modification will extend the current ordering period an additional two years from Oct. 31, 2026, to Oct. 31, 2028. Fiscal 2027 operations and maintenance, research, development, test and evaluation, and procurement funds totaling $112,309,403 will be obligated at the time of award via task order modification. The Missile Defense Agency, Redstone Arsenal, Alabama, is the contracting activity.
| ||||||